DESCRIPTION
Large-scale grassing works
Works performed in 3 phases (1996-1999)
Sophisticated logistics were necessary to perform works on the largest work site in the world at this time.
The CLK Airport was being build on an island, partially reclaimed from the sea, offering no fresh water resources, serviced only by ferries, and where hundreds of companies from all over the world were working simultaneously.
COMPLETED WORKS
64 in situ test plots
Soil analyses and tests (grass species, conditioners)
Installation of an in-situ laboratory
Grassing Method Statement
Qulaity Method procedures
Assesment and obeservance of a safety plan
Seed bed preparation and soil conditioning
Hydro-seeding over 360 hectares
COMPANY ACTIVITY
Landscaping
COMPLETION DATE
1996