Winning
client satisfaction and meeting the requirements of the golf course’s architect are Gregori International’s priorities in every project.
MANAGING ALL OF A GOLF COURSE’S CONSTRUCTION STAGES
Preliminary study


Close
Preliminary study
In cooperation with the golf course architects
> Market surveys
> Technical pre-studies
> Topographic surveys
> Soil analyses
> Resources inventory
> Detailed pre-project study
> Market surveys
> Technical pre-studies
> Topographic surveys
> Soil analyses
> Resources inventory
> Detailed pre-project study
Technical studies


Close
Technical studies
> Technical specifiactions
> Detailed technical studies
> Quantity calculations
> Fine-tuned estimation of implementation costs
> Irrigation studies
> Lighting studies
> Implementation plans
> Work planning
> Methodology
> Detailed technical studies
> Quantity calculations
> Fine-tuned estimation of implementation costs
> Irrigation studies
> Lighting studies
> Implementation plans
> Work planning
> Methodology
Financial Engineering


Close
Financial Engineering
> Preliminary budgets
> Profitability study
> Cash flow forecasts
> Business plan
> Profitability study
> Cash flow forecasts
> Business plan
Construction or renovation works


Close
Construction or renovation works
> Manpower mobilisation
> Equipment mobilisation
> Procurement and transport of supplies
> Setting up the worksite
> Setting-up of the nursery
> Selective clearing
> Trees transplantation
> Earthworks and levelling
> Excavation and sealing of water features
> Draining and irrigation networks
> Lighting installation
> Artistic modelling
> Grounds preparation
> Production of the greens, tees and bunkers
> Construction of routes
> Grassing
> Quality and safety check
> Cost and deadline management
> Commissioning of equipment
> Works acceptance
Maintenance contract


Close
Maintenance contract
> Selection and procurement of maintenance equipment
> Facilities check
(pump station, irrigation system)
> Maintenance schedules
(fertilisation, mowing, phytosanitary check)
> Equipment maintenance
> Team training
> Facilities check
(pump station, irrigation system)
> Maintenance schedules
(fertilisation, mowing, phytosanitary check)
> Equipment maintenance
> Team training
FACING UP TO ALL TECHNICAL CHALLENGES
-
CONSERVATION OF THE SURROUNDING AREA AND ECOSYSTEMS
-
RESPECT
OF THE LANDSCAPE’S NATURAL BEAUTY -
PROVISION OF RESOURCES
REGARDLESS OF THE SITE’S LIMITATIONS -
OPTIMIZATION OF NATURAL RESOURCES
(SOIL RECONSTRUCTION BASED ON ORIGINAL ELEMENTS) -
RESPONSE TO HYDRAULIC ENGINEERING ISSUES:
IRRIGATION SYSTEM OPTIMIZATION -
GRASS SPECIES SELECTION FOR AN OPTIMAL GROWING.
USE OF NATIVE SPECIES & MYCORHIZATION TECHNIQUES -
DEVELOPMENT OF EFFICIENT
METHODS THAT USE BRACKISH WATER
-
CONSERVATION OF THE SURROUNDING
AREA AND ECOSYSTEMS -
RESPECT OF THE LANDSCAPE’S
NATURAL BEAUTY -
PROVISION OF RESOURCES
REGARDLESS OF THE SITE’S
LIMITATIONS -
OPTIMIZATION OF NATURA
RESOURCES
(SOIL RECONSTRUCTION
BASED ON ORIGINAL ELEMENTS) -
RESPONSE TO HYDRAULIC
ENGINEERING ISSUES:
IRRIGATION SYSTEM OPTIMIZATION -
GRASS SPECIES SELECTION
FOR AN OPTIMAL GROWING.
USE OF NATIVE SPECIES
& MYCORHIZATION TECHNIQUES -
DEVELOPMENT OF
EFFICIENT METHODS
THAT USE BRACKISH WATER