Back portfolio

Chek Lap Kok Airport, Hong Kong

Scope of work :

Sophisticated logistics were necessary to perform works on the largest work site in the world. The CLK Airport is been built on an island, partially reclaimed from the sea, offering, no fresh water resources, serviced only by ferries, and where hundreds of companies from all over the world were working simultaneously.
64 in situ test plots (consulting services : 12 months)
Soil analyses and tests (grass species, conditioners)
Installation of an in-situ laboratory*Grassing method statement
Quality control procedures
Assessment and observance of a safety plan
Seed bed preparation and soil conditioning
Hydro-seeding over 360 hectares
Works performed in 3 phases (1996-1999)

 
 

FRANCE : Gregori International Head office - USA : Gregori International of Florida, Inc - UAE : Gregori International Emirates LLC - FRENCH POLYNESIA : Gregori International Polynesia