Hong-Kong National Stadium, Hong-Kong China 1993

The challenge took away was to build a stadium of 40 000 seats within 3 years.
With close cooperation between contractors (of whom Gregori international company) and consultants, the stadium was completed in just 2 years, a huge achievement considering the size and complexity. The stadium has been a real success.

Scope of works :

Complete construction of the field including : Earthworks, levelling & grading, installation of the drainage and irrigation systems, grassing with washed turf onto the top layer constituted of sand-mesh.
Duration of the works : 2 months - game opening 3 months after the beginning of the works

 
 