Back portfolio

Lowlands Golf Course Trinidad & Tobago, BWI 1999

Extensive engineering studies were the d=starting point for a series of storage lakes aimed at preserving the limited water resources on this island. This project required full co-operation between all the contractors involved in the construction of this 300 hectare real estate development.

Scope of works : 18 hole Championship Golf Course + 9 holes
Duration of the Works: 12 months (18 holes)
Engineering, excavation, waterproofing of 7 inter-linked lakes (storage capacity: 300 000 m3)

 
 

FRANCE : Gregori International Head office - USA : Gregori International of Florida, Inc - UAE : Gregori International Emirates LLC - FRENCH POLYNESIA : Gregori International Polynesia